Creative direction

Where every detail finds its direction.

01

About

Before we design anything, we listen.

We want to understand who you are, what moves you and what you imagine — including the things you may not yet have found the words to describe.

From these conversations, an idea begins to emerge.

We develop the creative concept, establish its visual language and give every subsequent decision a clear direction.

The result is not a collection of beautiful elements.

It is a world that belongs entirely to you.

02

Custom structures and staging, made by Tehiya Narvel
01 / 06

Custom structures and staging

Most of what you will stand inside does not exist until we build it.

Bars and furniture, made by Tehiya Narvel
01 / 06

Bars and furniture

A bar that fits one room and no other, made for the night it serves.

Ceilings and suspended pieces, made by Tehiya Narvel
01 / 06

Ceilings and suspended pieces

Structures that carry weight over four hundred people, engineered before anything is cut.

Tables at any length, made by Tehiya Narvel
01 / 06

Tables at any length

Tables at a length no rental company keeps.

Upholstery and textiles, made by Tehiya Narvel
01 / 06

Upholstery and textiles

Joinery, metal, upholstery, glass and print, in the materials the design calls for.

Signage and print, made by Tehiya Narvel
01 / 06

Signage and print

Made with workshops we have used for years.

03

Drawing stage of a Tehiya Narvel production

Drawing

2–3 weeks

The design becomes technical drawings: dimensions, materials, loads, fixings. Nothing goes to a workshop as a mood image.

Engineering stage of a Tehiya Narvel production

Engineering

2–3 weeks

Anything that carries weight, spans a distance or hangs above people is calculated and signed off. Venue and local authority approvals run in parallel.

Prototyping stage of a Tehiya Narvel production

Prototyping

1–3 weeks

Samples, finishes and full-size mock-ups of the pieces that matter most. You see and touch the material before it is committed.

Build stage of a Tehiya Narvel production

Build

4–12 weeks

Everything arrives in sequence and is assembled on site, usually overnight or across a closed day.