Close
Jillian & Kyle wedding in Switzerland: logistics by Tehiya Narvel

Logistics

Across continents. To the top of the Earth.

01

About

The most ambitious ideas often require extraordinary journeys.

We move people, materials and entire productions across countries, borders and difficult terrain.

Air freight, sea freight, customs, specialist transportation, mountain access, helicopters, installation schedules and international supplier coordination all form part of our logistical expertise.

Every movement is planned around the requirements of the destination and the production.

Whether the final location is a grand ballroom or a remote Alpine summit, everything must arrive where it belongs, when it belongs.

The complexity stays behind the scenes.

02

Custom structures and staging, made by Tehiya Narvel
01 / 06

Custom structures and staging

Most of what you will stand inside does not exist until we build it.

Bars and furniture, made by Tehiya Narvel
01 / 06

Bars and furniture

A bar that fits one room and no other, made for the night it serves.

Ceilings and suspended pieces, made by Tehiya Narvel
01 / 06

Ceilings and suspended pieces

Structures that carry weight over four hundred people, engineered before anything is cut.

Tables at any length, made by Tehiya Narvel
01 / 06

Tables at any length

Tables at a length no rental company keeps.

Upholstery and textiles, made by Tehiya Narvel
01 / 06

Upholstery and textiles

Joinery, metal, upholstery, glass and print, in the materials the design calls for.

Signage and print, made by Tehiya Narvel
01 / 06

Signage and print

Made with workshops we have used for years.

03

Drawing stage of a Tehiya Narvel production

Drawing

2–3 weeks

The design becomes technical drawings: dimensions, materials, loads, fixings. Nothing goes to a workshop as a mood image.

Engineering stage of a Tehiya Narvel production

Engineering

2–3 weeks

Anything that carries weight, spans a distance or hangs above people is calculated and signed off. Venue and local authority approvals run in parallel.

Prototyping stage of a Tehiya Narvel production

Prototyping

1–3 weeks

Samples, finishes and full-size mock-ups of the pieces that matter most. You see and touch the material before it is committed.

Build stage of a Tehiya Narvel production

Build

4–12 weeks

Everything arrives in sequence and is assembled on site, usually overnight or across a closed day.

From recentprojects

Tell us what you have in mind

Let’s talk