Close
Jillian & Kyle wedding in Switzerland: production by Tehiya Narvel

Production

Every element made, sourced or engineered.

01

About

This is where imagination meets execution.

Our production teams bring together technical design, staging, lighting, sound, structures, installations, florals and specialist crafts.

We coordinate the people, equipment and processes required to transform a concept into a physical experience.

From complex installations to complete venue transformations, every component is developed with the same attention to design, safety and execution.

The ambition may be extraordinary.

The execution must be precise.

02

Custom structures and staging, made by Tehiya Narvel
01 / 06

Custom structures and staging

Most of what you will stand inside does not exist until we build it.

Bars and furniture, made by Tehiya Narvel
01 / 06

Bars and furniture

A bar that fits one room and no other, made for the night it serves.

Ceilings and suspended pieces, made by Tehiya Narvel
01 / 06

Ceilings and suspended pieces

Structures that carry weight over four hundred people, engineered before anything is cut.

Tables at any length, made by Tehiya Narvel
01 / 06

Tables at any length

Tables at a length no rental company keeps.

Upholstery and textiles, made by Tehiya Narvel
01 / 06

Upholstery and textiles

Joinery, metal, upholstery, glass and print, in the materials the design calls for.

Signage and print, made by Tehiya Narvel
01 / 06

Signage and print

Made with workshops we have used for years.

03

Drawing stage of a Tehiya Narvel production

Drawing

2–3 weeks

The design becomes technical drawings: dimensions, materials, loads, fixings. Nothing goes to a workshop as a mood image.

Engineering stage of a Tehiya Narvel production

Engineering

2–3 weeks

Anything that carries weight, spans a distance or hangs above people is calculated and signed off. Venue and local authority approvals run in parallel.

Prototyping stage of a Tehiya Narvel production

Prototyping

1–3 weeks

Samples, finishes and full-size mock-ups of the pieces that matter most. You see and touch the material before it is committed.

Build stage of a Tehiya Narvel production

Build

4–12 weeks

Everything arrives in sequence and is assembled on site, usually overnight or across a closed day.

From recentprojects

Tell us what you have in mind

Let’s talk